
A Prior Roof Patch Is a Comparison Point, So Ask Each Roofer About It
Every roofer should say where an earlier patch sits on your roof, whether it comes off with the tear-off, and how the price changes around it.
Many St. Louis roofs carry the marks of earlier work. A limb strike from a summer storm, a vent replaced years ago, or a section where a previous crew lifted tabs to chase a leak all leave a trail on the surface. When you compare roofers, the old patch is easy to skip because it is not the roof you plan to buy. It is still on the house, though, and the way each roofer describes it tells you how carefully they read your roof before they priced it.
Roofer comparison
Start by asking each roofer the same plain question: where are the patches on this roof, and how old do they look to you? A patch leaves visible evidence. Look for a row of shingles in a slightly different shade, a cluster of nails that do not sit in the usual line, sealant beads along a valley or around a vent, or a tab that was clipped short to fit around a repair. A roofer who walked each slope and photographed it can point to those marks. A roofer who only looked from the sidewalk will say something like "some repairs on the back," and that answer gives you nothing to check.
Compare the replies on three points. First, did the roofer name each patch by slope and compass direction, not by vague words like the back or the side? Second, did they say what they think the patch was for, whether that is hail, a leak, a plumbing vent, or a repair from a different roofer? Third, did they say whether the patch will be torn off with the rest of the roof or left in place with a note? Each answer changes the bid. A patch that goes with the tear-off is one more line of removal work. A patch left in place means the crew has to decide how new underlayment meets an old repair, and that decision belongs in the written scope.
Ask for the photos in writing. A scope that Keys Roofing or any other contractor hands you should include dated photos of each slope, with each patch marked, along with measurements. You can keep those documents and compare them against the other bids. If a roofer will not produce a photo of a patch they described, mark that reply as unsupported in your comparison sheet, the same way you would mark any other line the roofer cannot show you.
Build the sheet with one row per roofer and one column per patch. Write each roofer's answer beside the patch it describes. If a roofer leaves a cell blank, record the blank. A blank on this line is information, because it means the roofer did not look or did not want to put the answer in writing before you sign.
What it costs
A patch can change a roof price in three ways, and each roofer should price them as separate lines rather than folding them into a general labor figure. The first is removal. Shingles around an old patch often do not lift cleanly because the sealant has bonded to the course below over the years. St. Louis summers soften that sealant, and winter freezes crack it, so the bond is rarely uniform. A crew may need to cut or pry more shingles than the new square count suggests. Ask each roofer how many courses they expect to re-lay around each patch and whether that count is inside the number they gave you.
The second is the deck. A patch that leaked for years can hide soft sheathing under it. Water that gets into wood during a freeze and thaw cycle has little way to leave, and a nail that once held a repair may have pulled into rotten board. Ask whether soft decking found during tear-off is priced as a unit rate per sheet or as a flat allowance, and how many sheets the bid assumes. A bid that says decking as needed with no rate attached is not a number you can compare against another bid, because the other roofer may have assumed zero sheets or twenty.
The third is the layer count. If the roof has two layers and the patch sits in the lower one, the crew may need to pull both layers in that area to get a clean deck. Ask whether the price assumes one layer or two, and where the roofer counted the layers. An answer from the attic side, where the old shingle edges show at the rake or the eave, is a stronger basis than a guess from the ground.
Older three-tab roofs deserve their own question. Once a three-tab roof has stiffened and its patches have been lifted and re-sealed more than once, the surrounding shingles may not accept another repair cleanly. At that point a roofer may recommend a larger tear-off over the patched area. That is a legitimate recommendation, but the bid should show it as a separate option with its own price, so you can see what a repair costs and what a larger scope costs before you choose.
What to ask
Put these questions to each roofer in the same words, and record the replies beside each other. Keep the answers short and specific. A reply that runs long but never names a slope, a shingle line, or a number is a reply to set aside.
- On which slope and compass direction does each patch sit, and can you show me the photo for each one?
- Will each patch come off with the tear-off, or will it stay in place? If it stays, where in the written scope is that noted?
- What shingle line did each earlier patch use, and does your new bundle match it in shade and profile?
- How many courses does your price assume you will lift around each patch?
- If soft decking appears under a patch during tear-off, is the replacement a unit price per sheet, and what is that rate?
- How many roof layers does your bid assume, and where did you count them?
- Will you walk each patch with me before the tear-off begins, and log what you find on a dated sheet?
- If a patch that looked sound lifts once the crew starts, who decides the next step, and how do I hear about it before the work changes?
Ask these questions by phone or in writing, and save the replies with the bids. The office line for Keys Roofing is (314) 220-2333, and a written reply to the same list is the easiest way to see whether each roofer read your roof the same way.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.