
A Pocket Door in the Hall Needs a Track Check Before Tear-Off
Ask each roofer who checks the pocket door track, who keeps dust out of the cavity, and who pays if the wall shifts during tear-off.
A pocket door in a St. Louis hall is a small piece of hardware that sits inside the wall, and most roof bids never mention it. The door slides into a cavity in the framing, rides on a track fixed to a header, and closes against a jamb that stays put. When a crew strips shingles above it, the vibration can knock the track loose, pull the door off its rollers, or crack the plaster around the pocket. Dust from the tear-off can also drift into the cavity and jam the rollers for years. This page is for the homeowner comparing two or three roof bids who wants to know which roofer owns that small part of the house.
Why a pocket door belongs in the comparison
Roof work above a hall is loud, heavy, and full of vibration. Tear-off uses pry bars and shovels, the dumpster is loaded from the eave, and the crew walks the deck in work boots. Older houses in the city and in close suburbs like Maplewood and University City often have plaster over wood lath. Plaster is usually the first thing to crack when a header or track shifts. A newer house may have drywall, which is easier to patch, but the door still needs a check before anyone calls it fine.
The reason to compare roofers on this is not that any one of them will break a door. It is that most bids leave the cavity out. A bid that says "protect interior finishes" can mean a drop cloth over the furniture and nothing more. A bid that names the pocket door, the track, and the wall cavity tells you the roofer has thought about that room before the first nail.
Roofer comparison: the three answers to listen for
Each roofer should answer three things in writing. First, who inspects the pocket door before tear-off begins, and what they check: whether the door slides freely, whether the track is level and fastened, whether the jamb is plumb, and whether the plaster around the pocket already has cracks. Second, who keeps tear-off dust and debris out of the cavity, and how. Third, who handles a repair if the door or track is damaged during the work, and how that repair is priced.
Put the answers side by side. A useful answer names a role, such as the foreman or the lead installer, and it names a time, such as before the first shingle is lifted. A weak answer says the crew is careful. A blank cell is also an answer, and it usually means the roofer has not considered the door. Keys Roofing can put these answers into the written scope so the homeowner has them before the crew arrives. The office number is (314) 220-2333, and the question is short enough to ask on the phone. Ask every roofer the same question in the same words, and write each reply down.
Watch for answers that move the risk onto you. A roofer who says "the homeowner should move anything near the wall" may be right about furniture, but the bid should still say who inspects the door and who records its condition. Responsibility for the check should not sit with you by default.
What it costs
A pocket door check is usually a small line in the bid, but the cost depends on what the check finds. A visual inspection and a slide test take a short time on site and should not carry a large charge. Repairs are different. A track that must be re-hung, a roller set that needs replacing, or a plaster patch around the pocket each carry their own cost, and the price depends on the door's age, the hardware, and whether the finish can be matched.
Ask each roofer which of these items sit inside the roof price and which are separate. Ask for a unit price on the track and rollers, and ask whether a plaster patch is priced by the square foot or by a fixed allowance. If the bid shows an allowance next to the door, ask what that allowance covers and what happens if the real work costs more or less.
Do not assume protection is free. Plastic sheeting, a dust barrier across the pocket, and a second person watching the door during the lift all take labor and materials. Some roofers fold these into the labor rate, and others list them as separate lines. Either approach can be fair, but you need to know which one you are comparing before you choose.
What to ask
Write these questions down before you call. Use the same wording for every roofer, and keep the replies in one folder.
- Who inspects the pocket door and its track before the first shingle comes off, and do you use a written checklist for that inspection?
- What do you do to keep tear-off dust out of the pocket cavity, and who checks the cavity before the crew leaves each day?
- If the track or door is damaged during the work, who calls me, and how soon will I hear about it?
- Is repair of the track, rollers, and plaster inside my roof price, or is it a separate line, and what is the unit price?
- Will you photograph the door, track, and surrounding wall before tear-off, and send me those photos with dates?
- Can the door stay closed during the lift, and what do you need from me on those mornings?
Good answers are short and specific. "We will check the door and send you photos before we start" is more useful than "we are careful with your home." If a roofer says the door is not their concern, ask who it is, and write that answer down too.
How the record protects you
Keep a dated photo set of the door, the track, and the plaster around the pocket before the crew arrives. Save it with the roof bid. If a crack appears later, that record shows the condition before the work began. Keys documents damage and places a written scope with photos and measurements in the homeowner's hands, and that record is what you keep. Missouri law (RSMo 407.725) bars a roofing contractor from representing or negotiating a homeowner's insurance claim, so any insurance question about a damaged wall belongs with your own insurer. The roofer's dated photos are the evidence you bring to that conversation.
When to walk away from a bid
If a roofer refuses to name who inspects the pocket door, refuses to put the repair price in writing, or says the door is covered only "if it breaks," you have learned how that company handles the house. The bid may still be low, but the price has not yet been compared with the same work described in the same words. Ask that roofer to revise the scope with the door in it, and compare the revised page with the others before you decide.
A pocket door is a small detail, but it shows whether a roofer reads the whole house or only the roof. Ask the question early, get the answer in writing, and let the answer count in the comparison the same way the shingle line does.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.