Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

A Mushroom Grow Room Downstairs Needs a Dust Line Before Roof Day

Tear-off dust can settle on a mushroom grow room, so ask each roofer how the crew seals and checks the space before the first shingle comes off.

If you grow mushrooms in a basement room, a roof job is more than noise and foot traffic. Tear-off throws fine grit, old granules and attic dust into the air, and that dust drifts down through floor joints, open returns and stairwells. A grow room depends on clean air, steady humidity and sterile substrate, so a few hours of dust can cost you a flush. Before you compare roofers on price, you need each one to name what the crew will do to protect the room and who checks it at the end of the day.

Why the grow room is a different question

Most roof-day pages deal with one object, like a clock, a piano or a telescope. A grow room is a set of conditions. A fruiting chamber needs air exchange through filtered or fresh intake, a humidity band that stays in range, and a temperature that does not swing. The substrate blocks, grain spawn and casing layers are open to whatever is in the room. A crew working overhead can also change the air pressure in a basement when the furnace or a bath fan pulls air up through the house. That pull can bring tear-off dust into the grow space through a door that does not seal well.

The useful first question is therefore not whether the roofer can keep your house clean. It is whether they can name the path dust takes from the roof to the grow room, and what they do at each point on that path. A roofer who answers with a general promise has not thought about your basement. A roofer who names the return grille, the door gap and the furnace filter has.

Roofer comparison

Put each roofer's answer beside the same three checkpoints: the room itself, the route to it, and the air inside it. Write the answers in the same order for every bid so the gaps show up on their own.

  • Room: Does the crew seal the grow room door with plastic and tape before tear-off begins, and do they say whether anyone from the crew will enter the room at all?
  • Route: Which stairs, floor grates, return vents and wall penetrations will the crew cover, and who does the taping?
  • Air: Will the furnace and air handler be shut off or isolated during tear-off, and who turns them back on and changes the filter afterward?

A real answer has a verb and a material in it. Saying the crew will take care of the dust tells you nothing you can check on the day. Saying the crew will tape the basement return and seal the grow room door with heavy plastic before the first nail comes out can be checked by walking downstairs at lunch. Mark any answer that stays vague as not yet answered, and ask again in writing.

Written scope from any roofer, Keys Roofing included, should list these protection steps so you can compare them line by line. If a bid says protect interior without naming the rooms, ask which rooms and which steps. The list matters more than the adjective.

When to plan the flush around the roof

St. Louis growers often run fruiting cycles in late fall and early spring, which are also the months when roof work tends to slip because of cold, wet decks and rain days. If a flush is due in the same window, ask each roofer which week they expect to start and how many days the job could run past that. A roofer who says the schedule depends on weather should be able to name what they will do with open substrate if the crew has to pause partway through a flush.

Ask also whether the crew will be working on the north or south slope on the days your grow room is most sensitive. Dust from the street-facing side of the roof reaches the basement by different routes than dust from the back. The answer tells you whether the protection plan is built for your house or copied from a template.

What it costs

Protection for a grow room is usually a small line item, but it has to be named. Plastic, tape and the hours to set up and take down are a materials and labor question. Cleaning the room afterward, including wiping shelves and deciding whether any open substrate can be kept, is a separate question. Ask whether the cleanup is in the bid or billed as a change order later.

Also ask who moves your own supplies. Bags of substrate, spawn jars, tubs and humidity controllers may need to come off the shelves before the crew starts. If the crew moves them, the bid should say so and say who puts them back. If you move them, the bid should say that too, and the crew should not be the one who finds your harvest on the floor.

Do not accept a price that says protect interior without a list behind it. Ask each roofer for the protection line in writing, with the materials and the hours it covers. Then compare those lines, not only the totals. One bid may fold the plastic into labor while another prices it apart, and the two totals will look different for reasons that have nothing to do with the roof.

What to ask

Bring these questions to every roofer, and write each answer beside the roofer's name so you can compare them later.

  1. Will the crew enter the grow room at all, and if so, will they wear covers over boots and hair before they step in?
  2. Which return vents, floor grates and stair openings will be taped, and who does the taping?
  3. Will the furnace or air handler be shut off during tear-off, who restarts it, and who confirms the filter is fresh?
  4. Who checks the grow room at the end of each day, and will they note any dust on shelves or substrate in writing?
  5. Who pays to clean the room if dust gets in, and is that cleanup a line in the bid or a change order?
  6. If the crew cannot finish in one day, what happens to open substrate or spawn left in the room overnight?

Take the answers to a second visit and ask each roofer to walk the route from the roof to the grow room with you. The walk shows whether the plan fits the house or only the sales sheet. If a roofer cannot show you the route, that is useful information too. Call the Keys Roofing office at (314) 220-2333 with any question that the bid does not answer, and ask for the answer in writing before the crew is scheduled.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection