A Missing Roof Part Stalls the Crew: Ask Each Roofer Who Buys It
When a part is missing mid-job, the bid should name who orders it, how long a stop can run, and who pays for the standby hours.
A roof stops when a part does not show up. The crew can be on the lot at seven with the shingles staged and the tear-off finished, and still sit idle because a box of drip edge, a roll of ice and water shield, or a case of pipe boot flashing never came off the truck. Most bids do not say who orders that part, who pays for the wait, or how long a stop can run before the schedule moves. You can find those answers before you sign by asking each roofer the same questions and writing the replies side by side.
Name the Part and the Person Who Orders It
Start with the parts list at the back of the bid, not the price on the first page. Look for drip edge, starter, ridge cap, ice and water membrane, vent flashing, and any metal that has to be cut to length on site. Some roofers buy those pieces on the same order as the shingles. Others pull them from a supply counter on the morning they are needed. Ask each roofer which method they use and whose name is on the order. If the answer is that the crew will "grab it when needed," write that down as an open item, because it means nobody has ordered anything yet.
Atlas and Malarkey shingles are the only lines Keys Roofing installs, so a Keys bid names those lines in the scope. Other roofers may quote a different line family, and an accessory that matches one shingle may not match another. Put the shingle name beside each accessory in your comparison so you can see whether one bid pairs its parts with a product the local supplier stocks. A part that has to be special ordered from out of town adds days, and those days belong in the schedule before the tear-off starts.
Ask, too, whether the parts are priced inside the roof total or listed as allowances. An allowance is a number that is not yet a price. If the drip edge line says a set amount with no footage, the real cost may move once the crew measures the eave. Compare that line across bids the same way you compare the shingle line.
Ask How Long a Stop Can Run
A missing part is a stop, and a stop is only a problem if it runs past the point where the open roof is safe to leave. In St. Louis that point matters. Decking that gets wet during a stop has to dry before the new underlayment goes down, and a freeze-thaw cycle can lift the edges of loose felt overnight. An open deck that sits through a warm afternoon followed by a hard freeze is a different job from one that closes before dusk. Ask each roofer how many hours or days a stop can run before the crew packs up, and what they do with the tarps and the nail line while they wait. The answer should be specific enough to repeat back: a number of hours, a tarp plan, and a person who checks the roof before the crew leaves for the day.
Compare the replies against the weather you expect. A roof that starts in late October has less margin than one that starts in June, because the forecast can turn in a single night and the parts supplier may close early on a cold day. Ask whether the roofer adds a weather hold day to the schedule or waits for a call to decide. Either can be fine. What matters is that the answer is in writing, with the day count and the trigger spelled out.
Find Out Who Pays for the Wait
When a crew waits on a part, somebody pays for the hours. The bid should say whether that cost is in the price, billed as a separate line, or left to the roofer's margin. Ask each roofer directly: if the crew stands by for a part you were told would arrive Tuesday, what does the homeowner pay for Tuesday, and what changes on the bill? Some roofers absorb a short wait and charge for a long one. Others bill standby by the hour from the first minute. Neither approach is automatically the better deal, but a bid that answers this question in one sentence is easier to compare than one that does not answer at all.
Ask whether a missed part can move your start date, and whether the roofer will tell you in writing when that happens. The Keys Roofing office line is (314) 220-2333, and that is a reasonable place to ask for the current stop policy in plain words before you choose a roofer. Write the name of the person who answered, the date, and the time next to your notes so the reply can be checked later.
Who Checks the Delivery Before the Crew Unloads
A part can arrive and still be the wrong size or the wrong finish. A drip edge in the wrong profile, a vent boot sized for the wrong pipe, or a starter strip for a different exposure can stop the crew as surely as a late truck. Ask each roofer who checks the delivery against the order before the crew unloads, and who calls the supplier if something is wrong. Ask whether the roofer keeps a spare of the common pieces on the truck, and what that spare list covers. A roofer who can name the spare list is easier to compare than one who says the crew will figure it out when they get there.
Check whether a return or exchange adds a restocking charge and who pays it. If the answer is that the homeowner covers the restocking fee on a wrong part, that cost belongs in your comparison beside the price of the part itself. A bid that says the roofer absorbs errors in their own order is a different bid from one that passes them through, even when the totals look close.
Build a Three-Row Table
Set up a simple table with one column per roofer and three rows: who orders each missing-part item, the longest stop the bid allows before the crew packs up, and who pays for standby hours. Fill in what each roofer writes. Blank cells are answers too. A blank in the standby row means the bid is silent on who pays, and you should ask that roofer to fill it in before you compare totals.
Keep the table with the bids and the call notes. When you call a roofer back to fill a blank, log the date, the time, and the reply. A week later, the same reply should still be the same reply. If it changes, the bid is not yet settled, and the roof date is not yet firm either.
What to Ask Each Roofer
- Which parts are on the shingle order, and which are bought on the morning they are needed?
- Whose name is on each part order, and where is the order confirmation kept?
- How many hours can a stop run before the crew packs up and the open roof is closed for the day?
- Who checks the roof and the tarp before the crew leaves during a stop?
- What does the homeowner pay for standby hours, and is that line written in the bid?
- Who checks each delivery against the order, and who calls the supplier if a part is wrong?
- Is there a restocking charge on a return, and who pays it?
- Does a missed part move the start date, and will you hear about it in writing?
Read the replies side by side. A roofer who answers each question with a number, a name, and a written line is giving you something you can check later. A roofer who says the crew will handle it is giving you a promise that nobody can verify on the day the truck is late.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.