A Missed Shingle Delivery Costs Days, So Ask Who Rebooks It
A shingle delivery that misses its window can stall your roof for days. Ask each roofer who rebooks it, how fast, and in writing.
A shingle delivery that misses its window does not just delay the truck. It holds the crew, leaves the deck open, and can push the job into the freeze-thaw months when a half-finished roof is the last thing you want. Most homeowners never think to ask who rebooks the truck, how long that takes, or whether the crew loses its place. Asking before you sign tells you more about how a roofer runs a job than most of the numbers on the bid.
This page is for a homeowner who has two or three roofers in the running and wants one clear fact: what happens when the materials do not arrive on the day the schedule says they will. Keys Roofing is the contractor behind this site, and the office number is (314) 220-2333. The questions below work for any roofer on your list.
Why a missed delivery is a schedule problem
On most residential jobs, the shingles come from a supply branch on a truck with a set arrival window, and the crew is scheduled around that window. If the tear-off starts on Monday and the shingles land on Wednesday, the roof is open for two days with nothing covering it except what the crew puts down at the end of each day. In St. Louis, that gap can run into a rain front, and rain on an open deck is a call to a tarp crew, not a shingle crew.
A missed delivery usually has one of three causes. The supplier's dispatch got the address or the window wrong. The truck was delayed by traffic, a road closure, or a weather day upstream. Or the order itself was short, with the wrong color, a missing bundle count, or a product that had to be pulled from another branch. Each cause has a different fix and a different cost, so a roofer who says the truck will come when it comes has not told you much.
Roofer comparison
When you ask each roofer the same question, the answer should name a person, a step, and a time. Compare these four parts across your bids:
- Who calls you. One roofer may say the project manager calls the homeowner the same day. Another may say the supplier calls the crew and nobody calls you. Write down the name of the person who makes that call.
- Who rebooks the truck. Some roofers hold the order with their supply branch and rebook it themselves. Others leave it to the homeowner to call the branch. The second answer puts the scheduling work on you.
- How the crew keeps its place. Ask whether a late truck pushes the crew to a later date, or whether the crew works another job while the shingles are sorted out. A crew pulled off your roof for a week is a different job from one held for two days.
- What gets checked at the new delivery. A rebooked truck is a second chance for a wrong color or a short count. Ask whether the bundle count and shingle lot are checked against the order before the crew unloads.
The strongest answer describes the sequence in order: the supplier is called, the new window is set, you are told the window in writing, and the crew confirms its own return date. Vague answers that begin with "we always get it done" or "it does not happen to us" may be true, but they give you nothing to hold the roofer to later.
Pay attention to whether the roofer can name the supply branch that fills your order. A roofer who cannot name the branch may not know who is responsible for the truck, and that is a fact you want before the order is placed.
What it costs
A missed delivery costs more than the truck. The most common cost is the crew's idle time, which may or may not be billed to you depending on the bid. Ask each roofer whether standby time is in the price, whether it is charged by the hour or the day, and whether it can be added to the final invoice without a written change.
Second, check for a redelivery or rebooking charge. Some supply branches charge a fee when a delivery is moved or repeated, and some roofers pass that fee through. Others absorb it as overhead. Either answer can be reasonable, but the bid should say which one applies. A bid that is silent on this leaves the question for the final invoice, when it is hardest to discuss.
Third, look at what happens to the open roof while it waits. A roof that is torn off and waiting for shingles needs a covered deck and a plan for weather. If that plan is a tarp, ask who buys it, who sets it, and who takes it down. A tarp rented for three nights costs far less than one rented for three weeks, and the gap is often a line item nobody priced.
Finally, ask whether a missed delivery changes the date you agreed to. If the roofer says the date slips at no charge, that is worth knowing. If the date slips and the price goes up, that is also worth knowing, and it belongs in writing before you sign.
What to ask
Take these questions to each roofer on your list, and write down the answers along with the name of the person who gave them.
- If the shingle truck misses its window, who calls me, and how soon after the miss?
- Who rebooks the truck with the supply branch: your company, or do I make that call?
- Does the crew hold its place on my roof, or is it pulled to another job until the shingles arrive?
- Is standby time billed to me? If so, at what rate, and is that rate written in the bid?
- Is there a redelivery or rebooking fee, and who pays it?
- Who checks the bundle count and shingle lot against the order when the replacement truck arrives?
- If the roof is open overnight while the truck is delayed, who sets and removes the protection, and who pays for it?
- Can you put the new delivery date and the crew's return date in an email to me?
Compare the answers the same way you compare the price. A roofer who names a person, a step, and a date is easier to hold to the schedule than one who promises a result. If two roofers quote the same price but give different answers on the truck, the one with the clearer answer is the safer choice for a job that depends on a delivery arriving on time.
If a roofer will not answer these questions before you sign, the refusal is itself information. You can call (314) 220-2333 to ask Keys Roofing directly, and keep notes from each call with the date and the name of the person you spoke with.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.