A Jury Summons Lands on Roof Week, So Ask Each Roofer Who Decides
When a jury summons overlaps your roof dates, ask each roofer who makes calls, signs changes and counts lost time while you are in court.
A jury summons arrives with a reporting date, and that date does not check your roofing calendar. If the crew is booked the same week, you may be sitting on a jury panel on the morning the trucks need to stage materials, or you may be in a courtroom while a soft spot in the deck waits for a decision. Jury summonses usually arrive by mail, and the instructions state whether you can request a later date and by when. Read those instructions before you talk to any roofer about dates, because a postponement request can have a deadline much shorter than a roofer's scheduling window.
This page is for the homeowner who has two or three bids in hand and a summons on the kitchen counter. It does not tell you whether to serve, and it does not tell you how a court will treat a request. Whether you can be excused is a question for the court, not for your roofer. What this page gives you is a set of questions to put to each roofer, so the answers can be compared on the same footing.
Why the owner's absence changes the job
Most roof days do not need the owner on site. Plenty of homeowners leave the crew to work and check in by phone at lunch. A jury day is different because the job can stop for reasons only you can settle. A crew may find rotted decking under the old shingles, a chimney flashing that was not in the scope, or a limb hanging over the work area that someone has to approve cutting. Each of those can need a written decision before the crew moves on. A decision made by text from a courthouse hallway is one you will want to find again later, so the question is where that decision gets written down.
Your absence also changes who answers the door. If no adult is home, a roofer may need a named person who can open the gate, approve a delivery of shingles and step outside to look at a problem with the crew. Ask who that person is before the day arrives, and write the name into the schedule next to the crew list. A name that appears only in a sales conversation is not enough on the morning of the job.
Six questions to put to each roofer
- Who on your crew can approve a change on site when the owner cannot be reached, and what is the limit of that approval, in writing?
- If a decision is pending when the crew reaches a problem, does the crew stop that slope, work another slope, or wait for you?
- How is lost time recorded, and who receives the day's log before the crew leaves the lot?
- Can the owner approve a change order by email or signed text, and does your contract accept that method?
- Who signs the daily completion sheet and the final walk, and can the owner sign after a court date that falls mid-job?
- If the roof date must move because of a summons, what does the contract say about rebooking, and whose calendar sets the new start?
Put the same six questions to every roofer, in the same order. A roofer who answers the first question with a foreman's name and a dollar or scope limit has given you something you can check later. A roofer who says the owner should just call the office has given you office hours, and the office may close while the crew is still on the roof.
How to read the answers
Compare the answers on authority first, because everything else depends on it. A named person with a stated limit is the strongest answer you can get in writing. An answer that depends on whoever picks up the phone is weaker, and you should note which roofer gave it. If you call the Keys Roofing office at (314) 220-2333 during the bid process, ask what hours the office keeps during roof weeks and who answers after hours. Write down the time of the call and the name of the person who answered, so the answer sits in your file beside the bid.
Lost time is the second thing to compare. A roofer who says the interruption is absorbed in the bid has told you something, but you should ask them to point to the line where it sits. Lines labeled standby, crew wait or idle time are the ones to set side by side across bids, because they show how each roofer prices an interruption you did not cause and could not have predicted. If one bid has no such line at all, ask the roofer where a court-week pause would be recorded.
Decisions that cannot wait for the court break
Some decisions cannot wait, and the roof will not hold still while you are on a panel. Deck repairs found mid-tear-off, flashing that has to be replaced before the next storm, and temporary tarping at the end of the day are the usual examples. Ask each roofer which of these would need you and which would proceed on a written approval you gave earlier. A written approval signed before the summons is only useful if the crew has a copy on the lot on the day it is needed, so ask how that copy travels.
For decisions that can wait a day or two, a short written note is enough. Ask each roofer to keep one shared job file with the date, the question, the answer and the name of the person who gave it. A file of four or five entries from a single job is easy to check at the final walk, and it is much harder to reconstruct from memory after a week of work.
Before the reporting date
Once the summons arrives, call the jury office named on it as soon as you can and ask whether a later date is available. Then tell each roofer the answer on the same day. Send the same message to every roofer you are comparing, because a change in your availability is a change to the conditions every bid was built on. Keep the court's reply as a dated record next to the bids, not in your email folder alone.
Before you ask any roofer to shift a start date, put the summons dates on the same sheet as the proposed start dates. A roof that begins the morning after a jury day may need an owner's signature on the completion form that falls on the same afternoon. A roof booked to start the week of a trial may need a new week entirely. Put both sets of dates in front of each roofer and ask for the first available start that clears the summons without leaving the house open for longer than the bid assumes.
What a useful answer sounds like
A specific answer names a person, a limit and a document. A vague answer uses phrases like we will take care of it or you will be kept in the loop, with no name attached and no record that would show whether the promise was kept. When you read the answers side by side, mark which roofer named a person, which named a limit and which pointed to a document you can hold. The roofer with the most marks is not automatically the right choice, but the one with the fewest has left you the most to guess on the day the crew arrives.
Keep your own list of questions and the answers each roofer gives, in the order you asked them. If one roofer answers by phone and another answers by email, copy the phone answer into your file the same day, with the time and the name of the person who said it. Those notes will matter more on roof day than any single sentence in a brochure.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.