Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

A Jammed Nail Gun Mid-Roof Shows Who Owns the Repair Call

Ask each roofer who clears a jammed nail gun, how long the crew waits, and whether the stop goes in writing before the first shingle lands.

A nail gun jams on a roof more often than most crews would like to say. The gun sticks, a nail bends over the feed, or a strip of coil nails shifts on the ladder side of the deck. The crew clears it in a minute and keeps nailing, and most days nothing goes wrong. For a homeowner, the question is not whether a jam happens. It is who decides what happens next, and whether that answer is written down before the crew is on your roof.

St. Louis timing makes this harder than it sounds. Shingles go down in a stretch of warm, dry days, and a crew that loses an hour to a jam in late October may be racing the afternoon temperature drop. Morning dew and shade on the north slope can keep the deck damp, and a rushed afternoon is where sloppy nailing shows up. A nail driven crooked, or a course set without its full nail count, will not show until the first hard freeze or the first wind-driven storm that tests the bond along the nail line.

Why a jam is a comparison question

A jam is a short event with a long tail. The crew stops, someone clears the gun, and the work resumes. If the crew handles this by habit, nobody writes it down. Your roof ends up with the right nail count or without it, and you would have no way to tell from the driveway. A written answer from each roofer turns that invisible moment into something you can hold them to.

Compare the answers on three points. The first is who clears the jam, by job title rather than by first name. The second is whether the nailing stops while the gun is cleared. The third is whether anyone rechecks the last course before the crew moves on. A bid that says the crew will fix it as they go gives you a feeling, not a process. Vague replies are worth noting even when the price is lower, because the vague reply is the one you will be explaining to the next roofer who inspects the job.

It also helps to ask about the gun itself. Some crews carry a spare gun and some do not. A crew with only one gun on the roof has no backup when that gun jams, which means the stop can run longer than the jam. Ask each roofer how many guns and air hoses are on the roof on a typical day, and whether a second gun is brought up when the crew expects a long run of nailing.

Roofer comparison

Put the replies in one place, not in three inboxes. A simple table works well: one row per roofer, and columns for who clears the gun, whether a second person checks the last course, what gets logged, and who pays for standby time. Blank cells are answers too. A roofer who says the crew handles it as they go has answered the question without saying who is responsible for a nail that went in crooked at three in the afternoon.

Ask every roofer the same question in the same words. The most useful version is simple: when the gun jams on my roof, who makes the call on whether the last course stands, and what do you write down? A lead installer who walks the nail line at the end of each run is a different setup from a laborer who clears the gun and keeps moving. Neither is wrong on its face, but the difference matters later. If a shingle lifts in the first storm after install, you want to know which person on the crew looked at that course.

Pay attention to what happens to any damage. A jam can drive a nail through a shingle tab, split the tab at the cutout, or crack the mat near the nail line. The repair depends on the shingle. Keys Roofing installs Atlas and Malarkey shingles, and a replacement tab has to match the lot and color on the roof as closely as the supply allows. A weathered roof will not match a fresh bundle exactly, so ask each roofer how they would source a replacement and whether they keep a spare bundle from the same job. A roofer who has a plan for matching is answering a different question than one who says they will find something similar.

The daily log is the last piece to compare. Ask whether a jam is entered in the site log, what the entry says, and whether you can read it at the end of the day. A log that records only the hours worked tells you nothing about a stop. A log that records the stop, the cause, the time it cleared, and the course that was rechecked gives you a record you can keep. The office at Keys Roofing can be reached at (314) 220-2333 if you want to ask how the log is kept before you choose.

What it costs

A jam rarely appears as a line on the bid. The cost comes from two places: the hours a crew waits while a jam is cleared, and any work needed to fix a shingle or nail that the jam damaged. Ask each roofer whether standby time for a jam is inside the bid or billed separately. Ask whether replacing a damaged shingle is included, and whether the replacement is priced by the piece or by the bundle. Those two answers can move a total more than a small difference in the unit price of the shingle.

Standby time matters most on a long day. If the weather turns and the crew has to stop mid-course, the hours they already spent waiting may be billed differently from hours spent nailing. Ask each roofer to say in writing how a stop for a jam is counted, and whether it is counted the same way as a stop for weather. A roofer who bills a jam as a weather day, or the reverse, is giving you a total that is hard to check.

Ask each roofer who pays to repair a tool that breaks on your property. A gun that fails on your roof is a cost for someone, and the answer should be in the bid, not in a conversation at the curb. The cost of a damaged shingle or a torn tab is a cost for the roof, and the bid should show whether the crew replaces it, how it is matched, and whether the replacement is part of the total. Keep both answers in the same folder as the scope so they can be compared against the other bids line by line.

Finally, ask whether any of these costs change if the job slips into a colder week. A jam on a cold morning can mean the crew switches to a different gun or a different nail. The bid should say whether that change carries a charge, and whether the nail count stays the same. The number on the page is only useful if you know which assumptions it depends on.

What to ask

Send the same questions to every roofer on your list, in the same order, and keep the replies in one folder. A roofer who answers in writing has given you something you can check later. A roofer who answers only on the phone has given you a memory of a conversation, which is harder to rely on when the crew is on your roof. These are the questions to put to each one:

  • Who clears a jammed nail gun on my roof, by job title?
  • Does the crew stop nailing while the jam is cleared, and who rechecks the last course?
  • Is standby time during a jam inside the bid or billed separately?
  • If a jam damages a shingle, how is the replacement matched to my roof?
  • Where is a jam entered in the daily log, and can I read that entry?
  • How many nail guns and air hoses are on the roof on a typical day?
  • Who pays to repair a crew tool that breaks on my property?

Keep each answer beside the question it answers. If two roofers give you different answers to the same question, write both down and ask each one to explain the difference in writing. A roofer who will not put the answer on paper has still answered the question, and you can weigh that reply alongside the price.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection