A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

A Home Video Studio Needs a Power and Noise Line From Each Roofer

Lights, cameras and a fixed recording schedule change what a roof crew can run, so compare each roofer's power and noise answers first.

A video studio in a den, a finished basement, or a spare room is a set of lights, a camera on a tripod, a microphone on a boom arm, and a computer that cannot lose power in the middle of a take. When the roof comes off, that room has to share the house with a crew running a compressor, a generator, a saw, and bundles dropped from the trailer. This page is for the homeowner who has already decided to have the roof done and needs to compare how each roofer plans around a room that cannot stop.

Roofer comparison

Start by sorting the noise into two kinds. The first is steady: a compressor humming on the drive, a generator running for the saw, or air moving through the nailer hour after hour. The second is sudden: the tear-off, when old shingles and nails hit the trailer floor, and bundles set down on the deck or at the eave with a thump. A recording session can often work around a steady hum, especially one that comes from far away, but it cannot work around a bang that lands during a take. Ask each roofer which of these they expect to run, and during which hours. Ask whether the compressor will be parked on the side of the house farthest from the studio wall, and whether the tear-off will happen on the street side or the side where your studio sits.

Next, compare the power plan. Ask whether the crew will plug into your house, bring its own generator, or do both. A crew running off a house circuit can pull enough load to make lights flicker and an audio interface drop out. A generator parked too close to an open window can push fumes and noise into the room you are trying to keep quiet. On a narrow St. Louis lot, the generator often ends up on the side yard or at the curb, and that changes how far the sound travels to your studio window. Compare the answers side by side. One roofer may say the crew brings a generator and parks it on the street, while another may say it uses an outlet in your garage. The second answer means your recording circuit is part of the roof plan, and you should know which breaker it sits on before the first nail goes in.

Then compare the schedule. A studio runs on takes, and a roof crew runs on a start hour, a lunch break, and a stop time when rain or a cold deck arrives. In a St. Louis summer, many crews start early to beat the heat, which puts their loudest hours in the morning, often when a home studio records best. In a St. Louis winter, a frosted deck can push the start later, and a late start can move the loud work into the afternoon. Neither pattern is a fault, but each one changes which days you can book a session. Ask each roofer for the start hour, the hour the noisiest work ends, and whether the crew will pause when you call a sound check.

Watch for the answer that sounds like agreement and gives you nothing to hold. A line such as "we will keep it quiet" does not name a window, a machine, or a side of the house. A useful answer names all three. A plan that says the compressor stays on the north side, runs from seven to eleven, and stops when you raise a hand at the back door is something you can compare against the next roofer's plan. The difference between a plan and a promise is exactly what the comparison is for.

Then look at the room itself. Ask whether the attic hatch, the tear-off zone, or the dumpster sits near the studio, because dust and vibration travel. A microphone, a lens, and a computer fan all pull fine dust in, and cleaning them after a roof week is a job you will do yourself unless the roofer's plan covers it. Ask each roofer how they keep tear-off dust out of rooms where people work, whether they will seal the studio door with plastic on attic days, and whether a crew member will enter the studio at all. Some roofers will say the studio is off limits, and that answer is simple to compare. Others will say the crew needs to cross the room to reach a window, and you should ask which route they will take and who walks it with them.

What it costs

A studio-protection line rarely shows up as its own price on a roof bid. It hides in labor hours, a generator rental, a dust barrier, or a line that reads as site setup. Ask each roofer to show you where that cost sits. A generator rental is a real cost, and the day rate for a unit large enough to run a compressor and a saw can add up over a multi-day roof. Plastic and tape for a sealed room add material, and the crew's time to set and strip them adds labor. The number depends on the roof, the rental company, and the number of days, so ask for it as a separate line rather than accepting a lump sum that says included.

Compare the lines in writing. A roofer who says the power plan is included should be able to point to the generator line, the fuel line, or the labor hours that cover setting it up. A roofer who cannot point to any of these may be planning to use your house circuit, which is a different plan with a different risk to the equipment in your studio. Ask what happens to the bid if the crew decides to add a generator on the second day, and whether that change needs your signature before the rental arrives.

There is also a cost on your side of the calendar. If you have booked studio time, a paid session, or a client recording that depends on a quiet day, a roof start that moves by a few days can cost you the session fee, a rebooked studio slot, or a rescheduled client. Ask each roofer how far their start date can move and how much notice they give before a move. A roofer who calls two days ahead follows a different plan from one who gives a week, and you should price that difference against your own bookings before you choose.

Keys Roofing, the contractor behind this site, can take these questions by phone at (314) 220-2333. Call with the list below and ask for each answer in writing, so you can set it beside the answers from the other roofers you are comparing.

What to ask

Ask each roofer these questions, and write each answer beside the roofer's name with the date you heard it:

  • Which tools will run, including a compressor, generator, or saw, and during which hours each day?
  • Will the crew plug into my house, bring a generator, or do both, and which breaker or outlet will the crew use?
  • Where will any generator or compressor park, measured from the studio wall and from the window nearest the room?
  • What time does the crew start, and what time does the loudest work stop each day?
  • If I call a sound-check pause, who on the crew hears it, and how fast does the work stop?
  • Where are the attic hatch, the tear-off zone, and the dumpster relative to the studio, and how is dust kept out of the room?
  • Will anyone enter the studio, and if so, what route do they take and who walks with them?
  • Is generator rental and room protection a separate line on the bid, and what is the price on each line?
  • How many days of notice do you give before a start date moves, and who calls me to tell me?

Write the answers down before you compare totals. A roofer who names the hours, the machine, and the place to park it has given you something to hold them to on the first day. A roofer who says it depends on the day has given you a reason to look harder at the next bid.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection