
A Home Salon Keeps Its Water and Power Through Roof Day, So Compare the Plans
A home salon's shampoo sink and hair dryer depend on water and power that a roof crew can disturb, so compare each roofer's answer before you pick a start week.
A home salon is a working room with a shampoo sink, a hair dryer on a wall arm or floor stand, a client chair that cannot be moved quickly, and a schedule of people coming through the front door. In St. Louis, many of these rooms sit in finished basements or converted bedrooms, often close to the water heater and the main electrical panel. When a roof comes off above the house, the tear-off, the ladder traffic and the crew's trips through the house all reach into that room. This page covers what to compare in each roofer's answer before you choose a start week, so the salon can keep its bookings without guessing what the crew will do.
Roofer comparison
Start with the water. A shampoo bowl is fed by a supply line and drains through a trap, and a crew moving through a basement can disturb both without meaning to. Ask each roofer whether the crew will touch any plumbing in the salon room, whether the water to that room will be shut off on roof day, and who turns it back on. A useful answer names a person, a time and the valve. A weak answer says the crew will be careful.
Next, power. A hair dryer often draws somewhere between 1,200 and 1,800 watts, and a chair light or steamer adds more on top of that. Roofers run compressors, saws and heaters, and some crews pull power from the nearest outlet, which may be on the same circuit that feeds the salon. Ask each roofer whether a compressor, generator or heater will sit on a circuit that serves the salon, and whether they will leave the salon outlets alone on roof day. If the answer is yes, ask which breaker they will use and whether they will label it.
Then the door. A salon runs on appointments, so a client who walks in during roof week needs to be met by someone who knows the day's plan. Compare how each roofer routes the crew through the house. Some crews use the side gate and the garage, and some carry materials through the front hall. Ask which entrance the crew will use, which entrance the salon's clients should use, and whether the crew will keep the path between them clear of shingle bundles and ladders. Each roofer should be able to show that route on a sketch of the lot.
Ask how each roofer will protect the salon's supplies. Open bottles of color, developer, shampoo and sprays can tip, leak or pick up grit if a crew member sets a bundle or a bucket on a counter. A clear answer says the crew will not use the salon counters or shelves as a staging area, and that any product left out will be covered or moved before the crew arrives each morning.
Finally, check whether the salon appears in the written bid at all. A bid that says nothing about the room leaves the plan verbal, and verbal plans are hard to hold a roofer to when the chair is wet and the water is off. Compare the bids side by side on one point only: does each one name the salon room, the water line, the circuit and the entrance? A blank line is an answer too.
What it costs
Most of the cost in a salon room is not on the roofer's bid. It sits with the homeowner and sometimes with the salon's own calendar. A plumber may be needed to cap and restore a supply line, and that visit is billed separately unless the bid says the roofer will pay for it. An electrician may be needed to add a dedicated circuit before roof day if the salon's dryer and lights share a line with the crew's equipment. Each of those is a line you should be able to read on paper.
The bid should also say who pays if the crew disturbs something in the salon. If a crew member breaks a supply line, the bid should name who calls the plumber, who pays that invoice, and how quickly the crew will be on site to help. Ask each roofer to put that answer in writing next to the salon line, not in a general sentence about damage. A general sentence is hard to act on the day a sink starts to leak.
Booked clients are a cost too. If the salon has to close for a day or two while the water is off or the room is blocked, the owner loses that revenue. Some roofers will move a start date to avoid a salon's busiest days. Ask each roofer whether they will schedule around the salon's booked appointments, and whether that change affects the roof price or the finish date. Compare the answer as a date, not as a promise.
Do not add these costs to a roofer's price in your head. Write them as their own lines on your comparison sheet, next to the bid total. A roofer who quotes a lower total but names no water plan may leave you paying for a plumber on your own schedule. A roofer who names the plan and the cost of each step gives you a number you can use.
What to ask
Put these questions to each roofer in the same words and write down the answer as it is given. Ask them before you sign, and ask them again on the week before the start date.
- Will the crew touch any plumbing in the salon room, including the shampoo sink, the drain and the supply valve?
- Will the water to the salon be shut off on roof day, and who turns it back on?
- Will any compressor, generator or heater share a circuit with the salon's outlets?
- Which entrance will the crew use, and which entrance should salon clients use during the job?
- Will the crew stage materials or tools on the salon counters, shelves or chairs at any point?
- Who covers open product bottles each morning, and who checks them at the end of the day?
- If a supply line is disturbed, who calls the plumber, who pays that invoice, and how fast will the crew respond?
- Will the salon's booked appointments be used to choose the roof start week, and does that change the finish date?
- Is the salon room, its water line, its circuit and its entrance named in the written bid?
Keep each answer beside the question it answers. If one roofer says yes to the water question and another says the crew will be careful, the second answer is not yet a plan. Send the same question again in writing and compare the replies when they arrive. If the answers stop changing from one message to the next, you have the comparison you need.
For questions about the bid, Keys Roofing's office line is (314) 220-2333. Ask for the walk-through to include the salon room, and ask that the sketch show the water valve, the circuit panel and the entrance the crew will use. That sketch is the document you compare against every other roofer's plan.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.