Best Roofers STLA ledger of the St. Louis roofing market
Talk to Keys Roofing(314) 220-2333
St. Louis MetroUpdated August 2026Advertising disclosure
Licensed and insuredAtlas and Malarkey shingles onlyGreater St. Louis, locally ownedReal jobsite photographs throughout
A ladder stabiliser resting on a weathered brown shingle roof, with a mesh gutter guard running along the eave
A ladder stabiliser set on a weathered roof, gutter guard along the eave. Whether gutters are removed and rehung, and whether they are cleared of tear-off debris, are two separate scope lines that quotes routinely leave out. A Keys Roofing jobsite photograph.
The document

A Home Coffee Roaster in the Garage Needs a Smoke Plan Before Roof Day

A home coffee roaster in the garage puts smoke and chaff near the crew, so compare how each roofer plans for it before the first nail.

A home coffee roaster in the garage is a small machine with a big smell and a lot of chaff. Roasting throws smoke, a papery dust called chaff, and heat out of a vent or an open door. A roof crew working above or beside that garage will breathe some of it and may track some of it into the house. For a homeowner comparing roofers, the useful question is not whether a crew can do the roof. It is what each roofer says will happen to the garage, the roaster and the air between the two while the roof is open.

Roofer comparison

Start by asking each roofer the same plain question: will the roaster run on roof days, and if it does, where does its exhaust go? Write each answer down beside the roofer's name. A useful answer names a shut-off time, a room or vent the roaster will not use, and the person who tells the crew the roaster is off before the first nail. A weak answer is that the crew will be careful. That tells you nothing about who decides when the roaster runs or who notices when it is running.

Listen for whether the roofer treats the garage as a work area or as a room to walk past. If the crew will stage shingle bundles, tools or ladders in the garage, the roaster and its green beans share that floor, and the bid should say so in writing. Ask whether the garage door stays open or closed while the crew is on the roof. An open door on a windy day pulls tear-off dust toward whatever sits near the opening, and a roaster sitting by the door is one of those things.

Compare the dust plans too. Each roofer should say how tear-off dust is kept out of rooms where people breathe, and whether the garage counts as one of those rooms. Two bids can answer that differently. One may seal the door between the garage and the house and leave the garage open to the yard. The other may cover the garage floor, close the garage during tear-off and run a clean-up pass each evening. Neither answer is wrong by default, but they produce very different days for the person who owns the roaster.

Look closely at timing. Roasting usually happens in batches, and many homeowners roast on weekend mornings. Those are also the mornings many roof crews start early, especially in the warmer months when the crew wants to get shingles down before the afternoon heat. Ask each roofer what time the crew arrives on the lot and whether the crew will hold its first noisy hour until you have finished a batch. A roofer who says they will wait for you is answering a different question from one who only says they can work around you. The difference matters when the roaster sits between the driveway and the ladder path.

Pay attention to how each roofer answers in writing. A reply that comes back the same day with a named contact, a shut-off time and a line about the garage door is a good sign. A reply that promises to talk about it on site is not a plan. Keep every reply in one folder so you can compare the wording side by side later.

What it costs

A roaster does not change the roof price on its own. It can change what the bid has to include, though. The usual items are a closed garage for part of a day, a slower tear-off in the bay nearest the roaster, a cover over the roaster during tear-off, and a clean-up pass after the crew leaves. Some roofers fold these into general labor. Others list them as separate lines. Neither approach is a reason to pick one bid over another by itself, but a bid that says nothing about the garage has not priced the garage at all.

Ask whether roaster protection is in the bid or will be charged later as a change order. A change order added mid-roof because the roaster was never named is the kind of surprise a written bid should prevent. If a roofer says the cover costs nothing, ask what it is made of and how it is held in place. A loose sheet of plastic can blow against a roaster in a gusty St. Louis afternoon, and a cover that is taped only to the floor can slide. The bid should name the cover, its size and who sets it up and takes it down.

Ask what happens to the chaff after the roof. Chaff is light and drifts into corners, shelves and door tracks for days. A roofer's clean-up plan should cover the garage floor, the shelves, the workbench and any threshold where the crew walked. Find out whether the crew will sweep or vacuum. A shop vacuum on tear-off grit is a different job from a push broom, and some roofers will not run any vacuum indoors. Whichever method they choose, the bid should say so, because the method decides how much dust lands back on the roaster afterward.

Watch for the price of time. If the roaster has to be shut down for a day and then restarted, that roasting session is lost, and the homeowner pays for it in beans, time and patience. Roofers do not charge for that, but their schedule decides how often it happens. A roofer who plans the roaster around the crew's calendar costs you less than one who asks you to plan the roaster around theirs.

What to ask

Put these questions to each roofer in the same order and write the replies on the same sheet, so the answers line up when you compare them:

  • Will the crew stage bundles, tools or the dumpster within reach of the garage, and which door will they use?
  • On each roof day, when will the roaster be shut off, and who tells the crew it is off?
  • Will the garage door stay open or closed during tear-off, and who decides if the weather changes?
  • Is roaster protection written into the bid as a named line, or will it arrive later as a change order?
  • How are chaff and tear-off dust cleaned from the garage, and does the crew run a vacuum indoors?
  • Who on the crew is the contact if smoke or dust reaches the house, and how do you reach that person?
  • What time does the crew arrive on the lot, and will the first hour wait for you on a roasting morning?

Blank answers count as answers. If a roofer skips the garage question entirely, that tells you how carefully the bid was written. Ask again in writing and note whether the reply comes back and how long it takes.

Keys Roofing can answer these questions for a Keys bid. Keys documents the work with a written scope, photos and measurements, and puts those in the homeowner's hands before the crew starts. Keys installs Atlas and Malarkey shingles only. If the garage roofline needs a shingle shade chosen with the roaster in mind, ask for the shade name in writing before the order goes in. The Keys office number is (314) 220-2333.

Keys RoofingRoofing, gutters and downspouts · Greater St. Louis · Licensed and insured
The eleven items, in writing

Ask for the scope before you ask for the price

A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.

Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.

Keys Roofing, direct

Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.

(314) 220-2333

This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.

Call (314) 220-2333Free inspection