
A Dead Animal Under the Deck Is a Roof Day Question, So Ask Each Roofer Who Removes It
Before the first nail, ask each roofer who removes a dead animal found under the deck, who pays for the stop, and how the find is recorded.
Most roof day worries are about the shingles, the ladder and the dumpster. A less common one turns up when the old deck is opened: a dead animal, often an opossum, squirrel or raccoon that crawled under the eave or into a soffit gap and died there. St. Louis houses with older plank or board decking, and houses with gaps where the fascia meets the soffit, see this more than most. When it happens in the middle of a tear-off, somebody has to decide who handles it, how it gets bagged, who pays for the time, and what gets written down. Those answers differ from one roofer to the next, and they are worth asking before the first nail is pulled.
Why the question comes up mid-job
A dead animal usually sits in a spot nobody checks until the deck is open. The crew may find it under a loose board, in the cavity above a bathroom fan, or against the back of a dormer cheek. Odor is often the first clue, and the crew may smell it before they see it. Spring and early summer are common times for this in the metro because young animals nest in attics and soffit voids, and some do not get out. Late fall brings a different pattern, as animals move in before the cold and sometimes do not leave.
The discovery itself is not dangerous to a homeowner who stays clear of it. The problem is handling. Dead wildlife can carry parasites and disease, so a crew should not pick it up bare-handed, shovel it into an open bucket, or throw it into the dumpster with other debris. How the crew handles it is a safety question as much as a cleanup one, and it should be answered in writing before anyone climbs the roof.
Roofer comparison
Put the same three questions to each roofer and write down the answers in the same words. First, who removes the animal: the crew on your roof, a separate removal service, or the homeowner. Second, what gets used to handle it, such as gloves, a sealed bag, and a disinfectant on the spot. Third, where the bagged animal goes, and whether it leaves your lot the same day.
Some roofers will say their own crew removes it at no added charge. Others will say the crew stops, photographs the find, and calls a removal service. A third answer is that the crew stops and waits for the homeowner to decide. None of these is wrong by itself. What matters is that the answer is specific and that it matches the roofer's written scope. A roofer who says the crew will "take care of it" without saying how has not answered the question.
Missouri wildlife rules add a check. The Missouri Department of Conservation requires a permit for people who remove nuisance wildlife for pay. If a roofer refers the removal to a third party, ask whether that party holds the permit. A roofer does not need to hold the permit personally to refer the job, but the person removing the animal should.
What it costs
The removal line is usually small, but it is never zero. A single animal removed by a service is often a flat trip charge plus the time on site, and a crew may bill its own labor if the find happens mid-tear-off. A bid should show the line, not leave it as an unpriced "as needed" note. Ask whether the removal is billed as a separate item, whether it is included in the labor rate, or whether it is an expense you arrange yourself.
The bigger cost is lost time. If the deck is open and the crew stops to wait for a removal visit, the roof stays open to weather. Ask how long each roofer expects the stop to last and whether a stop on the same day counts against the schedule or pushes the start of the next phase. Ask also whether the bid carries a standby line for that wait. A crew that sits idle for three hours on your roof is a cost, and a bid that does not name it will bill it some other way.
Sealing the opening afterward is also a line. The gap the animal used, often in a soffit vent, a gable louver or a fascia joint, needs to be closed. Ask whether the closure is in the base bid, and whether it is done with metal mesh rather than foam or loose board.
What to ask
- Who removes a dead animal found under the deck, and do they hold the permit the Missouri Department of Conservation requires for paid removal?
- What protection does the crew use when it handles the animal, and does the crew bag it before it moves?
- Where does the bagged animal go, and is it removed from my lot the same day?
- Is the removal billed as its own line, and what does that line cover?
- If the roof is open during a removal visit, how long is the expected stop, and is any standby time priced?
- Who closes the entry point, and with what material?
- Will the crew photograph the find and the entry point before anything is moved, and will those photos go in the job file?
Write each answer beside the roofer's name. A short written answer from each company is enough to compare them. If a roofer cannot say who removes the animal, ask the question again in writing and note how long the reply takes. Keys Roofing can be reached at (314) 220-2333, and that call is a fair place to start with any question on this list.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.