
A Cuckoo Clock on the Wall Needs a Stop Time in Each Roof Bid
A cuckoo clock's chime, pendulum and weights need a named stop time, a named person and a rehang step written into each roof bid before the crew starts.
A cuckoo clock on an interior wall does not care about your roof schedule, but the crew does. The clock chimes on the hour, the pendulum swings whether anyone is home, and the weights hang low enough to catch a ladder rail or a drifting bundle of felt. Before a St. Louis tear-off starts, the clock needs a stop time written into the roof bid. Each roofer's answer to who stops it, when, and who sets it back will tell you how carefully the job will be run.
Start with the room. Most cuckoo clocks hang on an inside wall near a stairwell, a hallway or a kitchen, which is where the crew carries bundles, plywood and debris buckets in and out. Tear-off dust drifts through every room that the attic hatch or the stair path reaches. A clock with a glass door or an open pendulum needs cover before that happens, and someone has to be named for the cover.
Roofer comparison
Put each roofer's reply side by side on four points: the stop time, the person who stops it, how the clock is protected, and how it goes back up. A roofer who says the crew will be careful has answered none of them. A roofer who says the foreman stops the pendulum at the start of tear-off, wraps the weights in a towel and leaves a dated note on the wall has answered all four.
Ask for the stop time as a clock time, not a phase of the job. "Before tear-off" can mean seven in the morning or after lunch, and a cuckoo clock chimes at the top of every hour from the first sunrise. Ask whether the chime is silenced by the crew or left for the homeowner to handle. A written answer should name the hour and the person who will do it.
Ask who lowers the weights and where they go. Weights on a cuckoo clock hang on chains or cords with heavy metal pieces at the end. If the crew lifts them out of the way, the clock stops under its own mechanism and nobody has to disturb the pendulum. If the crew has to lift the clock off the wall, the homeowner should know who carries it, where it waits, and who returns it to the hook. Compare whether each roofer offers a named spot in the house that sits off the crew's path.
Compare the answers on dust. Tear-off dust can settle on the face, inside the case and on the pendulum. A cloth over the case is not enough if a roof crew works above the room for two days. Ask whether the crew covers the case, whether it closes the room door, and whether the foreman checks the clock the evening before the crew leaves. A roofer who has never thought about the clock will answer that last question with a pause.
Compare the rehang. The clock goes back on its hook only after the roof is finished and the dust is out of the room. Ask each roofer who sets the time, who restarts the pendulum and who checks that the chime sounds at the next hour. A roofer who writes the rehang step into the scope has answered the question. One who says "we will put it back" has not.
What it costs
Stopping and restarting a cuckoo clock costs the roofer time, and that time belongs in the roof labor. The bid should say so. Some roofers fold the time into the general labor line, others list it as a separate homeowner task, and some leave it blank. A blank line is an answer too. It means you will be the one who stops the clock, lowers the weights and hangs the clock back up on the day the crew is busiest.
A clock repair is a different charge. If the pendulum is knocked out of beat, the chime fails to sound, or a weight cord frays when it is lowered, the fix belongs to a clock repair person, not the roofer. The roof bid should say whether the roofer will cover damage the crew causes, whether it will book a clock technician, or whether that bill is yours. Get that answer in writing, because a repair that starts on a Tuesday can outlast the roof date.
Do not expect a dollar figure for the stop from every roofer. The useful number is hours. Ask each roofer how many hours their crew expects to spend on the clock across the job, and compare that against the hours in each bid. A roofer who cannot give a number has not yet thought about the room.
What to ask
- At what clock time will the chime be silenced, and who silences it?
- Who lowers the weights, and where do they wait while the crew works?
- Will the case and face be covered before the first bundle reaches the attic hatch above or near this room?
- Who carries the clock if it has to come off the wall, and where does it sit?
- Who checks the clock the evening before the crew leaves the room?
- Who sets the time and restarts the pendulum after the job is finished?
- If the clock is damaged during the work, who books and pays for the repair?
If two roofers answer the same question differently, write both replies down before you pick. Call Keys Roofing at (314) 220-2333 and ask the stop-time question in your own words. Then ask that the answer appear in the written scope before the crew books its start date, so the clock is covered by the same paper as the shingles.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.