
A Cancellation Window Starts on One Day, So Ask Each Roofer Which One
Each roofer's contract counts a cancellation window from a different day, so compare the start date, the day count and the notice method.
A roof contract usually has a cancellation clause, and the clause usually counts days. The count can start on the day you sign, the day you receive a signed copy, the day the roofer delivers the paperwork to your door, or the day a notice is mailed. Those starting points can differ by several days, and on a roof job that gap decides whether a change of mind costs you anything. Before you compare prices, ask each roofer which day the window starts and how you send notice.
The question matters most in the weeks after a sales visit, when the price is still fresh and the second bid has not arrived. A homeowner who has heard three numbers in one week is the most likely to sign early and reconsider late. The cancellation window is the contract's answer to that second thought, and it only helps if you can read where it starts, how long it runs and how to use it.
Roofer comparison
Put each roofer's answer on one line. Write down the number of days, the day the count starts, the way you must send notice, and whether any charge applies once you cancel. Keep the exact wording beside the answer. "Three business days" and "three calendar days" are different windows, and a window that starts at signing is shorter than one that starts when you receive the signed copy.
Ask whether the window counts weekends and holidays. A window that runs over a long holiday weekend can be shorter in practice than the number on the page suggests. If the roofer answers "it is standard" without giving a number, log that as an open answer and ask again in writing.
Check the notice method too. Some contracts require a signed letter sent by mail, some accept an email to a named address, and some say only "written notice." A text message may or may not count. Ask which methods the roofer will accept and whether they will confirm receipt with a dated reply. A roofer who gets your notice should answer in writing, not by phone.
Then compare the sales visit with the contract itself. If the salesperson described a week and the contract says three days, the contract is what you can rely on. Ask the roofer to correct the page, initial the change and send you the corrected page with a date on it. Keep the uncorrected version too, so the two can be compared later.
What it costs
Canceling inside the window should cost nothing if the contract says so, but canceling after the roofer has ordered materials can carry a restocking charge, a material return fee or a charge for a crew that was already scheduled. Those costs are separate from the window itself. A roofer may give you three days with no fee and then bill for shingles already pulled from a supplier order. Ask for the fee schedule in writing, with the dollar amount or percentage and the date it starts to apply.
Ask whether a deposit is refundable inside the window and how long the refund takes. Ask what the deposit covers if you cancel after a permit has been pulled. Permit fees paid to a St. Louis County or city desk may not come back, and the contract should say who keeps that money. Ask the roofer to name the permit desk and the fee amount before you sign.
Shingle orders are the usual cost after the window closes. Atlas and Malarkey shingles are ordered against a specific bundle count and color, so a cancelled order may not be returnable. Ask whether a color or count change made before the order is placed is free. Ask whether a shingle order placed after the window closes can be returned, and if so, at what fee and within what time.
Weather can also stretch the calendar. In St. Louis, a cold snap or a wet spring can push a start date back, and a delayed start can move the materials order later than you planned. Ask each roofer whether a delay on their side resets the cancellation window or leaves it running. A window that is still open on the day the crew shows up is a different offer than one that closed while the job waited.
What to ask
- On what day does the cancellation window start, and what document or event starts it?
- How many days are in the window, and are they calendar days or business days?
- How do I send notice, and which address, email or method counts?
- Will you confirm in writing that you received my notice, and on what date?
- What fee applies if I cancel after the window closes but before materials are ordered?
- When are materials ordered, and at what point does the order become non-returnable?
- Is any permit fee or inspection fee refundable if I cancel?
- Will you correct the contract page if the sales visit and the written terms differ?
Write each answer beside its question in one folder. If a roofer will not give a start day or a fee in writing, that gap belongs in your comparison. If the answers are clear and the window is long enough for you to finish comparing the other bids, you are on a firmer footing when you sign. If anything in a contract is unclear, call the Keys office at (314) 220-2333 and ask for the answer in writing before you sign.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.