
A Boom Lift or Telehandler Needs Its Own Room on Your Lot
Some roof bids bring a boom lift or telehandler to the curb, and each bid should say how much of your lot that machine uses.
Many roof crews arrive with ladders and a hoist, but some bids bring a boom lift or telehandler to the curb. When one does, the machine decides which part of your driveway, lawn and side yard gets used for a day or more. A bid that says the lift is included, without a footprint, leaves you guessing about the part of the lot that matters most before the crew rolls in.
This page is for a homeowner who has two or three written bids in hand and wants to know what each one actually brings onto the property. The comparison covers equipment footprint, the ground under it, and who pays for the setup. It does not rank anyone.
Roofer comparison
Ask each roofer one plain question: will you use a ladder, a hoist, or a powered lift to reach the eave and the ridge, and which one for the steep planes? The answers should match the bid. If a bid says material goes up by hoist and the crew says a lift will also be used, the bid is missing a line.
A boom lift or telehandler needs more room than a ladder. Get each roofer to name the machine by model class, its operating weight, and its width with the outriggers or stabilizer legs down. A roofer who answers 'a small one' has not answered the question. A written line that gives the weight lets you check it against your driveway, your side yard, and any buried utility lines near the spot.
Then compare where each machine would sit. Ask for a sketch or a marked photo of the setup spot, the path the machine takes from the street, and the arc of the boom over your roof and your neighbor's yard. The boom swings. A bid that puts the machine on the driveway but never mentions the swing over the side fence has left out a working distance.
Ask about the ground. St. Louis freeze and thaw cycles soften lawn and clay soil, and an outrigger pad pressed into soft ground can settle in the middle of the day. In St. Louis County and on the older lots in the city, driveways are often concrete laid over fill that moves. Ask each roofer whether they lay pads or plates under the outriggers and whether those pads are in the bid or billed as a separate item. Ask what they do if the ground gives way under a leg. The answer should name a stop rule, not a promise.
Overhead wires matter too. A boom that rises near a service drop changes the work area, and the crew may need the utility to de-energize or move a line. Ask each roofer whether their operator checks clearance from the service mast and the drop before the machine goes up, and who calls the utility if a line sits inside the swing.
What it costs
The price of a lift is rarely a single number. Look for these lines in each bid and mark any that are missing: delivery or mobilization of the machine to your lot, the days of rental, the operator's time, fuel, pads or plates, and any permit for a curbside setup. A bid that folds the lift into the labor rate is not wrong, but you still need to see the number the lift adds.
Ask whether the machine charge is per day or per trip. A roofer who brings the lift for one morning and sends it back may bill a delivery charge both ways. A roofer who keeps it on the lot for the whole job may bill a daily rate that adds up quietly over a week of rain. Neither is a trick, but the two bids will not compare until you see the same unit on both.
Ask who pays if weather or a late delivery holds the machine. A written standby line, with a number or a formula, is easier to check than a phrase like 'weather delays are handled as they come.' If a bid has no standby line at all, ask the roofer to add one in writing before you compare totals.
Check the insurance certificate that covers the lift operator and the equipment. Ask for the certificate itself, not only the company name, and confirm that the named insured matches the roofer on your contract. Missouri does not license roofers at the state level, so the certificate and the signed contract are the paper you can hold.
A permit can also add cost. A lift parked in a public right-of-way, or one that needs a lane closed on a busy street, may need a permit from the city or county desk that covers your address. The rules differ from one municipality to the next, so ask each roofer which desk they called and whether a permit is in their bid or left for you to pull.
What to ask
Use these questions with every roofer on your list, in the same order, and write down each reply beside its question.
What is the make, model class and operating weight of the machine, and how wide is it with the outriggers or legs down?
Where exactly will it stand on my lot, and can you mark that spot on a photo of my yard?
How far does the boom swing, and which part of my roof, fence or neighbor's yard falls inside that arc?
Do you lay pads or plates under the outriggers, and who supplies them?
What do you do if the ground softens or a leg settles during the day?
Who checks overhead clearance from the service drop and mast, and who calls the utility if a line is inside the swing?
Is the lift billed per day, per trip, or both, and where is that written in the bid?
Who pays for standby if weather or a late delivery holds the machine?
Which permit desk did you check for a curbside setup, and who pulls the permit?
Can I see the operator's certificate and your liability certificate before the machine arrives?
If one roofer says the lift will not be needed but the bid still lists one, ask them to correct the bid in writing. If answers change between your first call and your final walk, keep both versions in your folder so you can see which one the roofer stood behind.
Keys Roofing can be reached at (314) 220-2333 to work through these questions before you choose. Bring the list and a copy of each bid to the call.
Ask for the scope before you ask for the price
A document that names the underlayment, the flashing detail, the ventilation and the decking unit price can be laid beside another one and compared. A headline number on its own cannot.
Keys writes that document with photographs and measurements, and it is yours to keep whether or not the work goes to us. You are welcome to hand it to two other companies and ask them to price the same roof.
Straight through to the Keys Roofing office. Roofing, gutters and downspouts across greater St. Louis, and nothing else.
This goes to Keys Roofing, the company at number one. None of the other companies named on this site receive anything you type here.